[email protected] Serving Brazil · Chile · Peru · Colombia · Argentina · Ecuador
Follow us
Since 2001 · Factory Direct

Warehouse Racking & Mezzanine Systems for South America

Engineered pallet racking, shelving and mezzanines for Brazil, Chile, Peru, Colombia and beyond.

High-density cold storage racking for South American food exporters
Cold Chain & Agribusiness

High-Density Storage for Cold Chain Exporters

Drive-in, shuttle and pallet flow racking that maximizes every cubic meter of refrigerated space.

Mezzanine and racking layout designed for agricultural warehouses
Free Engineering Support

Free 3D Layout & Load Calculation

Send your floor plan. Our engineers return a CAD layout and structural check, seismic loads included.

  • 25+ YearsRacking design & manufacturing
  • 30,000 t / monthIn-house production capacity
  • CE & ISO 9001:2015Certified quality system
  • 10,000+ ProjectsDelivered to 120+ countries
About HEDA Shelves

25 Years of Racking Engineering, Now Focused on South America

Guangzhou Heda Shelves Co., Ltd. was founded in 2001 and today operates a 30,000 m² manufacturing base with more than 300 engineers, technicians and production staff. We design, fabricate and ship complete warehouse storage systems: pallet racking, industrial shelving, cantilever racks and steel mezzanines.

For South American buyers, that means one accountable partner from the first CAD drawing to the last anchor bolt: structural calculations that consider your site's seismic zone, corrosion protection matched to tropical or coastal climates, and container load plans that keep landed costs predictable.

  • Free 3D rendering & CAD layout
  • Seismic-aware structural design
  • In-house cutting, punching & coating
  • OEM & ODM for regional distributors
2001Year established
300+Technical team members
30,000tMonthly production
30,000m²Factory site area
HEDA Shelves racking production workshop in Guangzhou
Watch: Inside our racking factory
South America Coverage

Engineered for Your Ports, Codes and Climate

Importing racking from Asia is about more than price per ton. We plan each project around the realities South American warehouses face.

  • 01
    Seismic loads: base plates, anchors and bracing are sized for the seismic data of your site, ready for review by your local engineer in Chile, Peru, Ecuador or Colombia.
  • 02
    Humidity & corrosion: phosphating plus electrostatic powder coating as standard, with galvanized options for cold rooms and coastal sites.
  • 03
    Landed-cost control: optimized container load plans and numbered components reduce freight cost and installation time.

Brazil

Santos · Paranaguá · Itajaí. Distribution, agribusiness & e-commerce.

Chile

San Antonio · Valparaíso. Fruit export, salmon cold chain & mining.

Peru & Ecuador

Callao · Guayaquil. Agro-export, shrimp, retail logistics.

Colombia & Southern Cone

Buenaventura · Cartagena · Buenos Aires · Montevideo.

Global delivery network of HEDA Shelves including South America
Why Choose Us

What Importers and Warehouse Operators Gain

Direct factory control over steel, engineering and quality inspection means fewer surprises after the container arrives.

20+ years racking industry expertise

20+ Years Industry Expertise

Two decades of solving load, layout and throughput challenges across logistics, retail and manufacturing warehouses.

Free 3D and CAD warehouse layout design

Free 3D & CAD Design

Receive 3D renderings, CAD floor plans and load calculations before you commit, at no cost.

Safe and durable steel racking components

Safe, Durable Quality

CE and ISO 9001:2015 certified production with batch QC before every shipment leaves the factory.

Fully customized warehouse storage solution

Fully Customized Solutions

Dimensions, load capacity, colors and accessories tailored to your pallets, forklifts and building.

Industry Solutions

Specialized Storage for South America's Key Sectors

Each industry has its own bottleneck. Select yours to see how we approach it.

Agricultural warehouse racking for seeds, fertilizer and feed
Bulky farm inputs, slow picking

Agriculture & Agribusiness

For grain processors, seed and fertilizer distributors and cooperatives from Mato Grosso to the Pampas.

  • Selective racking for bagged seed & agrochemicals
  • Drive-in lanes for seasonal bulk volumes
  • Mezzanines for packing & spare parts
Learn More
Auto parts storage shelving and racking
Cluttered bays, missing parts

Auto Parts Distribution

From tires and bumpers to clips and fasteners, serving dealer networks and aftermarket distributors.

  • Longspan shelving for small fast-moving parts
  • Tire and cantilever racks for long items
  • Shelving-supported mezzanines to double floor area
Learn More
Building supplies warehouse with cantilever racking
Heavy, awkward loads, wasted space

Building Supplies

For builders' merchants and home-improvement chains handling steel, timber, pipe and sheet materials.

  • Heavy-duty cantilever racking up to 3,000 kg/level
  • Pallet racking for cement, tiles & fixings
  • Outdoor-ready coating options
Learn More
Food and beverage warehouse pallet racking
Damaged stacks, poor FIFO control

Food & Beverage

For beverage bottlers, food manufacturers and wholesalers supplying fast-growing urban retail.

  • Pallet flow racking for strict FIFO
  • Radio shuttle for high-volume SKUs
  • Carton flow for case picking
Learn More
Cold storage racking for refrigerated warehouses
Expensive cold space, clogged aisles

Cold Storage

For fruit, salmon, shrimp, meat and dairy exporters where every refrigerated cubic meter counts.

  • Drive-in & radio shuttle for maximum density
  • Galvanized options for condensation zones
  • Low-temperature component selection
Learn More
Chemical and mining supplies storage racking
Unstable drums, mixed-storage risks

Chemical & Mining Supplies

For chemical, lubricant and mining-consumable distributors in the Andean region.

  • Drum supports and wire mesh decking
  • Segregated layouts with safety accessories
  • Heavy-duty frames for spare parts
Learn More
How We Work

From Floor Plan to Container in Four Steps

A transparent process so procurement, engineering and finance teams know what happens next.

01Project consultation

Consultation

Share drawings, loads and SKU profile. An engineer reviews your requirements.

023D layout design

Design

3D rendering, CAD layout and structural calculation, revised until approved.

03Racking manufacturing

Manufacturing

In-house fabrication with photo and video QC updates during production.

04Shipping to South America

Shipping & Install

Optimized container loading, export documents and installation guidance.

Production Process

10 Controlled Steps Behind Every Rack

Every stage runs in our own workshop, so tolerances, coating thickness and packing are verified before dispatch.

Raw steel materials inspection01

Raw Materials

Precision steel cutting02

Precision Steel Cutting

Automated column punching03

Automated Column Punching

Cold bending forming04

Cold Bending Forming

Profile roll forming05

Profile Forming

Steel surface polishing06

Polishing

Robotic and manual welding07

Welding

Pickling and phosphating pre-treatment08

Pickling & Phosphating

Electrostatic powder coating line09

Electrostatic Powder Coating

Quality control and export packing10

QC & Shipping

Certifications

Verified Quality You Can Present to Your Auditors

Importers in South America increasingly need documented compliance for insurance, customer audits and tender submissions. Our certifications are issued by independent bodies and can be shared with your project file.

  • CE · Certificate No. 2435-CPR-8605159
  • ISO 9001:2015 · No. 18624Q00169R0M · Valid until 2027-06
  • RoHS · Compliant coating materials
View All Certificates
CE certification mark ISO certification mark RoHS certification mark
HEDA Shelves CE certificate
HEDA Shelves ISO 9001 certificate
HEDA Shelves quality certificate
HEDA Shelves test report certificate

Trusted by international brands

Partner brand logo 1 Partner brand logo 2 Partner brand logo 3 Partner brand logo 4 Partner brand logo 5
Buyer Insights

Expert Guides for Racking Buyers

Practical knowledge from our engineering team to help you compare systems and budget accurately.

Dynamic storage racking systems comparison

Dynamic Storage Racking: Drive-In, Push Back, Pallet Flow & Radio Shuttle

How to pick the right high-density system by SKU count and rotation.

Warehouse mezzanine layout design

Warehouse Mezzanine Layout Design for Racking Projects

Column spacing, stair placement and load classes explained.

Warehouse racking system design and layout

Warehouse Racking System Design & Layout

Aisle widths, forklift reach and clearances that drive capacity.

Warehouse racking price guide

Warehouse Racking Price Guide: What Determines Project Cost

Steel grade, load, finish and freight factors behind the price.

FAQ

Questions South American Buyers Ask Us Most

Straight answers on logistics, engineering and after-sales support. Need more detail? Our engineers reply by email.

More FAQs
Do you ship warehouse racking to South American ports?
Yes. We ship full-container loads from South China ports to Santos, Paranaguá, Itajaí, San Antonio, Valparaíso, Callao, Buenaventura, Cartagena, Guayaquil, Buenos Aires and Montevideo. Typical ocean transit is 30–45 days depending on the route, and every load plan is optimized to maximize container utilization while protecting the powder-coated finish.
Can your racking be engineered for seismic zones in Chile, Peru, Ecuador and Colombia?
Yes. Our engineers include the seismic parameters supplied by your project in the structural calculation and upgrade base plates, anchors, bracing and beam connectors accordingly. We recommend final verification by a local licensed engineer against the applicable national code, such as NCh 433 / NCh 2369 in Chile, E.030 in Peru or NSR-10 in Colombia.
What is the typical production lead time?
With a monthly capacity of 30,000 tons, most standard racking orders are produced within 2–4 weeks after drawing approval. Large mezzanine or high-bay projects are scheduled in phased batches to match your construction timeline.
How is installation handled for projects in South America?
Every shipment includes numbered components, installation drawings and assembly manuals. Our team provides remote video guidance for local installers, and on-site supervision can be arranged for larger or more complex projects.
How do you protect racking in humid tropical or coastal warehouses?
All steel goes through pickling, phosphating and electrostatic powder coating. For cold storage, coastal or high-humidity locations such as northern Brazil, Colombia and Ecuador, galvanized components and enhanced coating specifications are available on request.
What information do you need to design my warehouse layout?
Please share your warehouse floor plan, clear ceiling height, pallet or carton dimensions, load per pallet, forklift type and lift height, number of SKUs, inventory rotation method (FIFO or LIFO) and the seismic zone of the site. Our engineers then prepare a free 3D layout and CAD drawing.
HEDA Shelves warehouse storage engineer

"Every layout we send is checked by an engineer who has designed real warehouses, not generated from a template. If a rack would not pass our own inspection, it does not leave the factory."

HEDA Shelves Engineering Team
Start Your Project

Get a Free Warehouse Layout from Our Engineers

Email your requirements and receive a 3D layout, CAD drawing and structural recommendation, typically within 24 hours on business days.

  • Floor plan & ceiling height
  • Pallet size & load per pallet
  • Forklift type & lift height
  • Site city & seismic zone
No. 133-1, Tingyuan Road, Xingang East Road, Haizhu District, Guangzhou, China
Contact Our Engineers