[email protected] Serving Brazil · Chile · Peru · Colombia · Argentina · Ecuador
Follow us
ISO 9001:2015 & CE Certified Heavy-Duty Storage Engineering

Custom OEM Bolted Pallet Rack Manufacturers & Supplier

Global Engineering White Paper: Precision Cold-Formed Q235B/Q355B Steel, Seismic-Resistant Bolted Upright Trusses, Completely Knocked Down (CKD) Freight Optimization, and Turnkey Logistics Solutions.

Engineered Product Catalog

Industrial Bolted Rack Systems & Heavy-Duty Warehouse Storage

Explore our precision-fabricated bolted pallet rack configurations, designed for extreme load-bearing, seismic damping compliance (RMI MH16.1 & EN 15512), and tailored warehouse throughput architectures.

Selective Racking Heavy Duty Selective Bolted Assemble Industrial Steel Warehouse Pallet Rack

CE Certified Heavy Duty Selective Bolted Industrial Pallet Rack Shelving

Capacity: 1,000 - 4,500 kg/lvl
Steel Grade: High-Tensile Q235B
Frame Pitch: 50mm / 75mm Adj.
Safety Factor: 1.5 Design Limit
Parts & Carton Rack Light Duty Adjustable Metal Shelves Bolted Structure

Light Duty Adjustable Metal Shelves Bolted Structure for Parts & Carton Storage

Capacity: 200 - 800 kg/lvl
Configuration: Modular Bolted Post
Finish: Epoxy Powder Coat
Application: Workshop & Parts
Multi-Tier Mezzanine Corrosion Resistant Steel Mezzanine Storage Rack System

Corrosion-Resistant Bolt-Structured Powder Coating Steel Mezzanine Platform

Floor Rating: 300 - 1,200 kg/m²
Structure: Bolted I-Beam/Omega
Decking: Steel / Plywood / Grate
Vertical Gain: Double/Triple Cube
E-Commerce Heavy Duty Heavy Duty Pallet Racking System Q235B Steel

Heavy Duty Pallet Racking System Q235B Steel 1000-4000kg Load for E-commerce

Unit Load: 1,000 - 4,000 kg/bay
Profile: Box Beam 80-160mm
Locking: Integrated Safety Pin
Turnaround: High Throughput
ESD / High SKU Heavy Duty Selective Pallet Steel Rack Powder Coating ESD Protection

Selective Bolted Frame High SKU Pallet Stacking Rack with ESD Powder Finish

Protection: ESD Static Dissipative
Upright: Cold-Roll Omega Form
Access: 100% Individual SKU
Bracing: K / X-Pattern Bolted
Industrial Hybrid Industrial Pallet Rack Shelving Boltless Heavy Duty Warehouse Rack

Industrial Pallet Rack Shelving Heavy Duty Warehouse Goods Stacking Rack

Connection: Bolted Post / Hook Beam
Deck Options: Wire Mesh / Steel Strip
Bay Height: Up to 12,000 mm
Compliance: FEM 10.2.02 / CE
Long Span Adjustable Adjustable Flexible Steel Selective Pallet Rack

Adjustable Flexible Selective Long Span Bolted Racking Warehouse System

Span Length: 1,800 - 3,900 mm
Corrosion: Dual-Stage Pretreatment
Compatibility: Counterbalance / Reach
Adaptability: Multi-Tier Expandable
Automated Radio Shuttle Automated Radio Shuttle Warehouse Pallet Racking

Heavy-Duty Steel Racks with Automated Radio Shuttle Movable Pallet Equipment

Automation: Semi-Automated Shuttle
Rotation: FIFO / LIFO Dynamic
Lane Depth: Up to 40 Pallets Deep
Efficiency: +80% Density Increase
25+
Years Engineering (Est. 2001)
30,000t
Monthly Steel Capacity
30,000m²
Factory Floor Area
120+
Export Destination Nations
Structural Engineering Analysis

Why Global Supply Chains Are Transitioning to Bolted Pallet Racks

In modern intralogistics procurement, the decision between all-welded upright frames and modular bolted racking frames governs not merely the initial capital expenditure (CAPEX), but lifetime operational agility, seismic resilience, and oceanic freight economics.

Evaluation Parameter Modular Bolted Pallet Racks (HEDA Shelves Standard) Traditional All-Welded Uprights Strategic Procurement Benefit
Ocean Freight Volume (CKD) Completely Knocked Down (CKD); up to 300% more steel per 40ft HQ container High Void Volume; shipping empty air across sea lanes Drastic reduction in landed cost per pallet location ($/pallet position)
Seismic Ductility & Energy Damping Bolted shear joints flex and dissipate lateral ground accelerations without brittle failure Rigid heat-affected weld zones prone to fatigue cracking under cyclical seismic shock Complies with Chilean NCh 2369, Peru E.030, Colombia NSR-10, and US RMI codes
MRO & Field Repairability Individual damaged column segments or bracing bars unbolt and replace in under 45 minutes Entire welded upright frame must be cut out, scrapped, or repaired via hazardous hot work Zero open-flame warehouse hazards; minimal rack downtime during forklift impact repairs
Surface Protection & Corrosion 100% full immersion pickling and electrostatic powder coating on all internal profiles Hidden internal crevices at weld seams often rust prematurely in humid conditions Extended asset lifespan in cold storage (-30°C) and tropical coastal logistics hubs
Custom Height & Beam Pitch Adaptability Continuous CNC punched pitch (50mm / 75mm); expandable vertical frame extensions Fixed weld points; highly restrictive to future beam level reconfigurations Future-proof flexibility as SKU dimensions and automation hardware evolve

Grade 8.8 High-Tensile Fasteners

Every truss node in our bolted upright frame utilizes ISO metric Grade 8.8 or 10.9 hot-dip galvanized and zinc-plated structural bolts with integrated serrated flange locknuts. This eliminates vibration loosening caused by repeated high-reach turret truck operations and seismic micro-tremors.

Optimized K-Bracing Geometry

Our structural design software calculates precise load-shedding angles using proprietary K-bracing and hybrid X-bracing truss layouts. By transferring horizontal wind, seismic, and impact forces into the slab anchor grid, buckling risks in extreme upright heights exceeding 12 meters are mitigated.

Custom OEM Profile Tooling

As a vertically integrated original equipment manufacturer, we produce custom post profiles including teardrop, hexagonal, omega, and slotted diamond patterns. We match legacy racking profiles for distributors across North America, Europe, Australia, and Latin America.

Market Intelligence

Strategic Procurement Trends in Industrial Racking (2025–2030)

Global supply chain shocks, increasing warehouse floor land costs, and automated logistics integration are fundamentally altering the technical criteria by which enterprise procurement directors source pallet racking.

1. The Shift to Total Landed Cost (TLC) Procurement

Historically, procurement managers compared ex-factory purchase prices ($/ton). However, container freight volatility has shifted the industry metric to Total Landed Cost per Usable Pallet Position. Bolted pallet racks shipped CKD enable up to 26–28 tons of high-yield steel to be packed into a single 40ft HQ container without wasted cubic space. Compared to welded frames, which consume substantial container volume with trapped air, bolted engineering saves between 35% and 55% on ocean freight line items.

2. Automation-Ready Hybrid Architectures

The boundary between purely manual storage and automated warehousing has dissolved. Modern warehouses require bolted frames that can transition from manual selective forklift access to semi-automated radio shuttle carts, or integrate automated guided vehicles (AGV) and autonomous mobile robots (AMR). Tight manufacturing tolerances (±0.5mm beam sweep under FEM 10.2.02 codes) are mandatory to prevent sensor misreads by robotic mast systems.

3. Strict Regional Seismic Validation

Insurance underwriters and municipal building authorities across the Pacific Rim, the Andes corridor (Chile, Peru, Colombia), and Southern Europe now reject generic, non-validated rack designs. Enterprise buyers require pre-engineered finite element analysis (FEA) demonstrating compliance with local response spectra, dynamic base plate sizing, heavy chemical anchor embedment depths, and high-ductility bolted connections that will not collapse under sudden seismic ground displacement.

4. Decarbonization and Circular Life-Cycle Audits

Global ESG reporting requires verifiable mill test certificates (MTC) documenting prime grade steel origins, non-toxic lead-free thermoset powder coats (RoHS compliance), and modular systems that can be disassembled, re-sold, or re-engineered into multi-tier mezzanines without being relegated to scrap metal during tenant warehouse relocations.

Manufacturing Technology

Material Science & In-House Fabrication Workflows

Behind every high-tonnage rack installation stands an automated manufacturing matrix. We control every stage from certified prime hot-rolled coils to robotic profiling, punching, and finishing.

Raw Materials Inspection
Step 01
Raw Material Coil QC
Precision Steel Slitting
Step 02
Precision Slitting
Automated CNC Punching
Step 03
Automated CNC Punching
Cold Bending Forming
Step 04
Cold-Bend Forming
Continuous Profile Roll Forming
Step 05
Profile Roll Forming
Surface Shot Blasting and Polishing
Step 06
Polishing & Shot Blast
Robotic Beam Welding
Step 07
Robotic Beam Welding
Multi-Stage Pickling & Phosphating
Step 08
Pickling & Phosphating
Electrostatic Powder Coating
Step 09
Electrostatic Coating
QC Inspection and CKD Container Packing
Step 10
Batch QC & CKD Packing
Manufacturing Partner

Why Global Tier-1 Importers Partner with HEDA Shelves

Over 25 years of engineering leadership, supplying global logistics networks, FMCG distribution hubs, pharmaceutical cold storage, and regional racking distributors across 120+ countries.

Dual Independent Quality Certifications

Certified under CE Certificate No. 2435-CPR-8605159 and ISO 9001:2015 No. 18624Q00169R0M. Full structural safety compliance validated by independent auditing bodies for hassle-free customs clearance and municipal building approvals.

Complimentary 3D CAD & FEA Layouts

Send your warehouse architectural DWG drawings. Within 24–48 hours, our structural engineering team generates precise CAD layouts, aisle turning radius simulations, load distribution calculations, and photorealistic 3D warehouse renderings free of charge.

30,000 Ton In-House Scale

Equipped with 30,000 square meters of production workshops, continuous roll-forming lines, multi-station automated hydraulic punches, and automated dual-line powder coating ovens. We consistently meet 2 to 4-week production lead times for standard high-volume orders.

Global Port-to-Port Logistics

Expertise in full container load (FCL) packing plans that eliminate sea freight damage. Direct shipments to major logistics hubs including Santos, Valparaíso, Callao, Buenaventura, Rotterdam, Houston, Long Beach, and Jebel Ali with complete export customs documentation.

Procurement Knowledge Base

Frequently Asked Questions: Bolted Pallet Racking

In-depth engineering, logistical, and commercial clarifications to support your enterprise Request for Quotation (RFQ) process.

What specific steel grades and mechanical standards are used in your bolted upright frames?
We manufacture our bolted upright columns primarily from certified Q235B and high-yield Q355B structural steel, which are chemically and mechanically comparable to ASTM A36 and ASTM A572 Grade 50, as well as European standard EN 10025 S235JR and S355JR. Yield strength ratings range from 235 MPa to 355 MPa with minimum elongation percentages of ≥21%. Mill test certificates (MTCs) displaying heat numbers, chemical composition (C, Mn, Si, S, P), and tensile-yield test curves are archived for every production batch and furnished with your shipping documents.
How are bolted pallet racks calculated and anchored in high-risk seismic zones?
For seismic projects located in regions such as the Andean corridor (Chile NCh 2369, Peru E.030, Colombia NSR-10) or US seismic design categories D, E, and F (IBC/ASCE 7), we run site-specific dynamic finite element response spectrum models. We enlarge baseplate footprints (up to 12mm-16mm thick steel), integrate dual-hole heavy-duty wedge or epoxy chemical capsule anchors, and specify reinforced diagonal and horizontal K-truss configurations. The bolted joints provide plastic moment damping, preventing sudden structural brittle fractures during cyclical ground accelerations.
How does the completely knocked down (CKD) packing of bolted racking reduce ocean freight costs?
All-welded upright frames create large geometric envelopes that trap empty air inside an ocean container. Consequently, a 40ft HQ container often reaches its volume limit while carrying only 12 to 14 metric tons of steel. By shipping uprights as Completely Knocked Down (CKD) components—where upright post profiles, horizontal braces, diagonal braces, and baseplates are nested tightly in dense, pre-banded bundles—we maximize container weight to the permissible 26 to 28 metric tons. This doubles or triples the number of pallet locations shipped per container, slashing oceanic landed freight costs per pallet by up to 50%.
Can you manufacture OEM custom profiles compatible with existing teardrop or European brand racks?
Yes. As a custom OEM/ODM manufacturer, we maintain tooling for standard North American teardrop configurations (compatible with Interlake, SpaceRak, Mecalux), European 50mm and 75mm pitch profiles (compatible with Dexion, Stow, Jungheinrich), and proprietary Australian slotted patterns. We can match precise hole punching geometries, post profile cross-sections, and beam end-connector claw arrangements to seamlessly integrate with your existing warehouse infrastructure.
What surface treatments and anti-corrosion finishes are available for cold chain and humid environments?
All steel components undergo a multi-stage automated pre-treatment line consisting of alkaline degreasing, acid pickling, rinsing, and zinc phosphating. For ambient indoor logistics warehouses, we apply an electrostatic powder coating (60–90 microns thickness) cured at 180°C–200°C, providing exceptional impact and scratch resistance. For deep-freeze cold storage facilities (down to -30°C) or highly corrosive coastal warehouses, we supply hot-dip galvanized components (meeting ISO 1461, 70–100 microns zinc thickness) or pre-galvanized high-yield steel coil roll-formed parts to prevent flaking and red rust formation.
What is the typical production timeline, and how is installation handled internationally?
Standard production lead time is 2 to 4 weeks following approval of final shop drawings. Every shipment is organized by project phase, with components color-coded, labeled, and accompanied by detailed CAD erection drawings and torque specification charts. While installation is typically executed by certified local installation contractors, we provide real-time remote engineering video support and can dispatch multilingual on-site installation supervisors for mega-projects exceeding 10,000 pallet positions or complex rack-supported mezzanine floors.
What quality control inspections are conducted before containers are sealed at the factory?
Our ISO 9001:2015 quality assurance workflow enforces five inspection hold points: (1) incoming coil dimensional and chemical hardness verification, (2) CNC punching pitch and beam connector hole tolerance checks (±0.2mm), (3) weld penetration and radiographic test checks on robotic beam end-connectors, (4) dry-film powder coating cross-hatch adhesion and gloss tests, and (5) trial assembly of bolted frame modules. Pre-shipment inspection (PSI) reports with high-resolution photography and video verification are shared with client procurement teams prior to dispatch.

Start Your Turnkey Bolted Racking Project

Connect directly with our structural engineering team. We convert your floor plans into fully optimized, seismic-compliant CAD racking layouts, complete with structural calculations and FOB/CIF landed cost estimates.

  • Complimentary 3D Architectural CAD Design
  • Finite Element (FEA) Seismic Calculations
  • Container Utilization & Load Optimizations
  • Factory-Direct OEM Pricing & Fast Lead Times

Direct Engineering Consultation

Average response time: Under 4 business hours. Receive technical drawings and project quotations promptly.

Inquire Now